Hello folks,
I am just starting to work myself through the Scrum-Guide 2020 and I am a bit confused about the following passage:
“Inspection enables adaptation. Inspection without adaptation is considered pointless. [...]“ (p. 4)
Therefore, in a scenario, in which we inspected a workflow and concluded that everything worked fine - this inspection would be pointless since we do not have to adapt to anything, right?