Prerequisites for Generating a burn down chart

$
0
0

Hi All, I need to generate Sprint Burn down chat in Jira. So before putting the backlog item I found I need to have the estimate logged in the stories else the chart treats them as scope creep. Need one help

1. what is the difference between story point field and story point estimate field

2. When this is to be updated so that the burn down is properly reflected as per what is actually happening in sprint