When doing Scrum with Kanban the guide doesn't mention anything about sizing the stories. Should all stories have the same size?
Reading Daniel Vacanti's book: Actionable Agile Metrics for Predictability: An Introduction says that stories don't have to be the same size, but I don't see how the cycle time calculations won't be affected by that.