When a card moves through the different columns or states on a Kanban board, does each column have to have a specific Definition of Done. Is there anything out there that states that such a requirement is needed? or could we just have one Definition of Done that can be used to inspect the work that reaches the final column?
↧
Does Kanban require that there is a Definition of Done for each state the work/item flows through?
↧