As a Scrum Master, I have been asked by the Director of Development to provide a measurable "artifact" of how the team is doing. They want to be able to measure how well the team is working together and how they are progressing as a team. They have proposed that the Scrum Masters provide an output of what was identified as action items from a team's Retrospective and then measure if the team implements or finishes an action item.
↧