Is it possible to bifurcate work stage (I mean visualization) in JIRA ? For example, Code review is bifurcated into To Do and In Progress. This is required as I want to set max limit for WIP in some of the stages.
To Do
In Progress (max 4)
Code Review
- To do
- In progress
Internal Testing
- To do (4)
- In progress (2)
UAT
Done