I was trying to coach my PO on maintaining the backlog and was in return asked if there were any specific techniques/measures that could be used to ensure that the backlog is as transparent as possible.
My understanding is that as long as the backlog is accessible to the relevant stakeholders and the scrum team(s) that work on it, then it is transparent. Btw, we use JIRA to keep our PBIs.
I'd like to ask if there is anything else that I may have overlooked?