hii friends
There could be different category (requirement defects/production defects) of defects of different severity/priority (urgent/showstopper/critical/non-critical) getting identified by team at different stages such as during sprint/in production/from prior sprints.
1. How these defects should be handled in Scrum?
Should all defects be added into PB as a PBI irrespective of it needs to be fixed immediately or can be deferred?
2. Is there any guidelines which says if the defects found during current sprint needs to be fixed always in current sprint?