Hello everybody,
I would like to hear your opinion(s) about what is the best way to deal with remaining when you size your user stories using story points.
Example: in sprint X there are 40 man/days of capacity and the sprint content is 30 sp. At the end of the sprint 2 user stories, let's say of 3 and 5 sp (so 8 sp in total), are not completed (but still part of the job is done for these user stories). Given that in sprint X+1 there will be a capacity of 40 man/days too, what is the best way of computing the remaining?
I have heard several options: