When a product owner creates an initial backlog before the first Sprint, do all Product Backlog Items need to be assigned with Story points already or can story points be assigned gradually throughout the project?
↧
When a product owner creates an initial backlog before the first Sprint, do all Product Backlog Items need to be assigned with Story points already or can story points be assigned gradually throughout the project?