As per Scrum 2020: if Scrum becomes too large, they should consider reorganising into multiple cohesive Scrum Teams, each focused on the same product. Therefore, they should share the same Product Goal, Product Backlog and Product Owner.
How about the Scrum Master? Do they have have to share the Scrum Master as well or they can have more than one Scrum Master?