Scrum is based on empiricism, utilizing numerous feedback loops in the form of Events (Daily Scrum, Sprint Review, Sprint Retrospective), but feedback comes from other places too (the marketplace, etc.). Inspection gives us validation, which enables adaption. What are some concrete methods of documenting that feedback? I'd hate to lose the feedback that we work so hard for.
↧