Who is taking control of the Scrum Board/Software (say e.g. JIRA) ? The PO or the Scrum Master ? Talking about the backlog items selected for the sprint, does the developer choose und pull the task himself from the overall backlog into the Sprint Backlog and assigns the task to him/her or does the SM or PO does that ? Who has the overall control of the Planning Tool ?
↧