Hello to all,
This week I've started to prepare for PSM I. The resources mentioned in this forum help a lot.
One thing I don't yet understand is:
Can the number of SBI in a sprint change during a sprint?
In the Open Assessment there is a question that it can be changed by the PO together with DT.
In the SM Training Manual it is fixed (bottom p26).
In the Scrum Guide (p14) only DT can only refine the existing SBIs.
If the number can be changed every sprint will be successful (items not done can be removed).
If the number is fixed: Is the question in the Open Assessment correct?
This week I've started to prepare for PSM I. The resources mentioned in this forum help a lot.
One thing I don't yet understand is:
Can the number of SBI in a sprint change during a sprint?
In the Open Assessment there is a question that it can be changed by the PO together with DT.
In the SM Training Manual it is fixed (bottom p26).
In the Scrum Guide (p14) only DT can only refine the existing SBIs.
If the number can be changed every sprint will be successful (items not done can be removed).
If the number is fixed: Is the question in the Open Assessment correct?