As the title, I wonder what is different between Kanban and Waterfall. In waterfall we will do phase to phase it means when we finish 1 step so we can move the another step. In the photo below, as you can see if we define the flow like this, we still waiting until the work item is finished in column then it will move to another colunm. So is it look like the waterfall?
↧