We miss clarity on prioritization of epics taken into business analysis & design in a sprint, we do not know if the scope of sprint is sufficient to have all epics and user stories design ready when needed for a delivery team, we learned the scope of work was not always sufficient only ex-post, we miss the connection and coordination between epics taken into design and epics to be taken into delivery in the next sprint/s.
↧