Hey!
It is pretty straight forward to develop set of related features defining sprint goal to around them. But the problem is that our SaaS product is very extensive and we have also a lot of very small, totally unrelated, stories and I have no idea how to create coherent sprint goal for them. The main power of Scrum is a team work and collaboration, but those attributes are lost, if everybody do their own stories. If the product owner says that this story x is on very high priority, but it is totally out of the other stories scope, what I should do?
Thanks for help!