Is a story done even if it has defects attached to it ?

$
0
0

Dear all,

i have a question regarding defects detected during a sprint. If while testing a user story, defects are detected, it seems logical to open bugs about them. But what do you do with the user story at the end of the sprint ? Should it be closed ? Or deported to the next sprint even if there is nothing left to do on it except work on its bugs ? And in that case, what do you do with its story points ?