What to do with a tasks that will be performed between 2 sprints (i.e. demoing at an event)

$
0
0

Hi, I am not sure how to allocate the following story:

an engineer has to travel to Japan to do a demo. The task will foresee a preparation (test the demo) + the demo itself.

The preparation will be done at the end of one sprint while the demo will be at the beginning of the next sprint.

 

I thought about splitting the task in 2 - preparation and actual demo. But my engineer won't be present during the Show & tell anyone, as he will be travelling to Japan. So his team won't get the full story points anyway.

 

What is the correct approach?