In our team we don't have dedicated Scrum Master so one of the developer is playing the role of SM. I know this is wrong but it can't be changed.
In out system, we assign story points to all the stories at the time of grooming and Production issues don't have story points but we ASSUME it's 3 story point. For us 1 story point is 1 day (again it can't be changed).