PO and DoD

$
0
0

Hi everyone, so I am studying (still) to pass the PSM I. 

This question came up in an external website (recommended in this forum);

 

The Product Owner has doubts about the quality of the definition of “Done”. What should s/he do?

Answer: Increase the product quality by adaptation of the definition of done in the next sprint retrospective.

 

I got the answer correct, but at the same time I have doubts/ confusion.

 

So in the scrum guide it says: