Quantcast
Channel: Scrum.org Forum
Viewing all articles
Browse latest Browse all 5648

Does a scrum master need to know technicalities of the project

$
0
0

Hello I come from a absolute non technical background. Recently I was assigned to absolute technical project (something related Azure , cloud and etc) as a Scrum Master.

It is now expected of me to have the entire backlog ready. and to take down the notes during the technical meetings, categorize them as In scope,out of scope and Risk etc and communicate it with the different stakeholders. 


Viewing all articles
Browse latest Browse all 5648

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>