If an inspector determines that one or more aspects of a process deviate outside acceptable limits, when must an adjustment be made?
- After Scrum Master approval
- After clarifying all the details with the Product Owner
- The deviations should be discussed at the Daily Scrum and then an adjustment must be made
- As soon as possible to minimize further deviation
I selected 2, after clarifying with the PO.