Sprint Length: In Which scrum even, sprint length is decided

$
0
0

I have following queries:

  • In which scrum event sprint length is decided
  • Once decided can it be changed?

as per Scrum guide, "Once a sprint begins, its duration cannot be shortened or lengthened". This mean if there is a ongoing sprint we can only change the length of the sprint which going to come next. Does that mean, the sprint length is decided in Sprint Retrospective event ?

 