I have following queries:
- In which scrum event sprint length is decided
- Once decided can it be changed?
as per Scrum guide, "Once a sprint begins, its duration cannot be shortened or lengthened". This mean if there is a ongoing sprint we can only change the length of the sprint which going to come next. Does that mean, the sprint length is decided in Sprint Retrospective event ?