Hi, in materials for PSPO 1 course, there is a picture showing how risk changes over time in SCRUM and Waterfall. I am not sure if I am understand it correctly, because i think that risk in Waterfall increases over time, not decreases. Could you tell me how to interpret this drawing? Thanks :) (Red is waterfall, green is SCRUM)
↧