1. Interference and distraction slows the team's speed dramatically.
2. Because the Trello board can't be changed in a sprint.
3. Because it will increase the cost for the sprint.
4. Because it will decrease the quality of the sprint.
Hi everyone, doing a quiz on Scrum and I am having trouble with this question.
I believe the answer to be 1. but I feel 4 is also relevant.