Question :
During a Sprint retrospective, for what is the Product Owner responsible for ?
a) Capturing requirements for the Product Backlog
b) The Product Owner should not take part in Sprint Retrospectives
c) Participating as a Scrum Team member
e) Summarizing and reporting the discussions to the stakeholders that he/she represents in the Scrum Team
It is optional that the Product Owner attends to this meeting in the Scrum Guide. So I'd answer c. Is it correct ?